[1]
Grabovy, P. and Sezemin, D. 2024. The Membrane Method of Assessment of Organizational and Technical Reliability and Aggregate Risk of NPP Construction Projects. TEC EMPRESARIAL. 19, 1 (Mar. 2024), 344–354. DOI:https://doi.org/10.1229/tecempresarialjournal.v19i1.408.